Île-de-France
Bonal Manutention (Groupe BOVIS) recently carried out a handling and installation operation involving a chiller unit at a hospital in Mantes-la-Jolie (Yvelines, 78), in the Île-de-France region.
This operation demonstrates the expertise of its teams in handling technical HVAC equipment, as well as their ability to adapt their organisation to meet the specific constraints of hospital environments and customer requirements.
As part of this project, Groupe BOVIS teams were commissioned to deliver and position a chiller unit within a healthcare facility in Mantes-la-Jolie.
This type of equipment, which is essential to the operation of certain technical installations, requires carefully controlled handling and particular attention during transportation and positioning.
Even when it is a routine service for specialist teams, installing a chiller unit requires thorough preparation, suitable equipment and close coordination between the various contractors working on site.
The objective is to ensure the precise positioning of the equipment while taking into account the hospital environment and its operational constraints.
The operation was organised to ensure that the chiller unit could be transported and installed under the best possible conditions.
In a hospital environment, handling operations must take into account vehicle movements, patient and staff flows, as well as access restrictions to the various areas of the site.
Intervention planning and the choice of delivery time slot are therefore essential to ensuring the smooth completion of the operation.
BOVIS teams carried out the positioning of the equipment while taking into account its immediate surroundings and the specific requirements associated with this type of technical installation.
The day after the installation, during the intervention of the pipefitter responsible for connecting the unit, one of the chiller's coils was accidentally damaged during drilling work.
Following this incident, the customer contacted Groupe BOVIS to arrange the temporary removal of the equipment and its return to the depot.
To meet this request, a new intervention was scheduled for Friday morning, during a time slot designed to minimise vehicle traffic in the hospital car park.
This arrangement made it possible to take the site's traffic restrictions into account and coordinate the various stages involved in removing the equipment.
After being removed from the healthcare facility, the chiller unit was transported back to Groupe BOVIS's depot.
A technician was scheduled to work directly at the company's premises to replace the damaged coil.
Once this technical operation had been completed, a new delivery of the chiller unit was arranged so that it could be repositioned within the hospital.
This multi-stage process highlights the importance of flexible and responsive logistics organisation, capable of adapting to unforeseen circumstances encountered during a project.
Beyond the initial handling operation, Groupe BOVIS supported its customer in managing the situation, from the removal of the equipment through to the preparation of its new delivery.
Handling industrial and technical equipment requires specific skills, both in the preparation and execution of operations.
Groupe BOVIS mobilises experienced teams and appropriate equipment to support its customers with the handling, transportation and positioning of equipment subject to a wide range of constraints.
Every operation is based on several key principles:
This approach ensures continuity in customer support and enables Groupe BOVIS to meet the requirements of even the most specialised technical environments.
This operation was carried out by Bonal Manutention, which supports its customers with their handling, transportation and installation projects involving technical equipment.
Thanks to its experience and complementary areas of expertise, the agency undertakes operations requiring rigorous organisation, effective management of access constraints and the ability to adapt to the specific characteristics of each environment.
Through its BTP & Energy Centre of Excellence, Groupe BOVIS supports players in the construction, energy and infrastructure sectors with projects requiring the handling, transportation and installation of technical equipment. With specialised teams, suitable equipment and rigorous organisation, the Group works in particular with HVAC equipment, industrial installations and technical systems subject to specific constraints. Its expertise enables it to meet the demands of complex environments, particularly in hospitals, where precise handling, coordinated operations and careful management of operational constraints are essential.
From the initial delivery to the management of an unforeseen technical issue, this hospital operation demonstrates Groupe BOVIS's ability to mobilise its expertise to meet customer requirements.
Its expertise in handling, transporting and installing technical equipment is built on proven methodologies, efficient logistics organisation and a strong ability to adapt.
Groupe BOVIS supports healthcare facilities and industrial stakeholders with their equipment handling and installation projects, with one constant commitment: providing a technical and logistical solution tailored to every operation.
Share on :