On the occasion of the international CIGRE conference held at the Paris Convention Centre, Bonal Manutention, a member of Groupe BOVIS, deployed its teams to handle the reception, handling and installation of several pieces of industrial equipment on exhibitors' stands. This large-scale technical operation required rigorous logistical organisation, specialised handling equipment and thorough management of access constraints.
The CIGRE conference (International Council on Large Electric Systems) is a major international event dedicated to electrical power systems and the challenges of the energy transition. It brings together experts, engineers, industrial professionals and international decision-makers from the energy sector in Paris.
The teams were tasked with receiving, transporting and installing several industrial machines intended for the stands of various manufacturers and equipment suppliers in the electrical sector.
The operation notably involved equipment from HITACHI, SIEMENS, GE, HYOSUNG, SIEYUAN and SHEMAR.
The intervention took place in several phases, from the prior reception of certain pieces of equipment at the agency's depot to their installation on the stands, followed by dismantling and return at the end of the exhibition.

The exhibition installation took place over three days, from 19 to 21 August, with human resources progressively deployed to meet the requirements of each stage of the project.
The teams were organised according to operational needs:
The dismantling phase, organised when the exhibition closed on Saturday 29 August, required an even larger team, with 13 employees on site.
This organisation made it possible to coordinate the various operations and comply with the installation and dismantling schedule imposed by the event.
Prior to installation, certain pieces of equipment were received directly at Bonal Manutention's depot in order to prepare their transportation to the Paris Convention Centre.
Among them, one particularly large machine required specific preparation due to its dimensions and the building's access constraints.
Initially packed in a container, this equipment had to be dismantled into three separate sections to allow it to pass through the site's goods lift.
This operation required several preparatory steps:
This preliminary preparation was essential to anticipate dimensional constraints and ensure that the equipment could be transported to its final location.
It demonstrates the ability of the Bonal teams to adapt their handling methods to the characteristics of the machines and the specific constraints of each environment.
One of the main specificities of this operation was the restrictions imposed at the exhibition venue.
Forklifts were only authorised for unloading lorries. All installation operations on the stands therefore had to be carried out without using them.
To meet this requirement, the Bonal Manutention teams deployed various handling and lifting equipment to move and position the machines with precision.
The equipment used included:
The complementary nature of this equipment made it possible to respond to the different configurations encountered on the stands.
The use of this specialised equipment, combined with the experience of the handling teams, made it possible to install the industrial equipment despite restrictions on the use of conventional handling machinery.
Each operation required the equipment used to be adapted according to the weight, volume, configuration of the machine and its final location.
Installing industrial machinery in an exhibition space involves specific constraints, particularly in terms of access, movement and simultaneous activities.
Unlike an operation carried out at a traditional industrial site, handling operations at an exhibition must be integrated into a temporary environment, with specially arranged exhibition spaces and defined installation deadlines.
The presence of large machines, sometimes packed in several sections, requires careful planning of movements and lifting operations.
For this operation, the Bonal teams had to take into account:
Equipment preparation, the selection of handling resources and the adaptation of working methods were therefore essential to ensuring the smooth running of the operation.
When the conference closed on Saturday 29 August, the Bonal Manutention teams carried out the dismantling of the installations and the removal of the machines from the stands.
This final phase involved 13 employees, who were responsible for handling all the equipment and organising its return under the best possible conditions.
Particular attention was once again paid to the SIEYUAN machine, which had the largest dimensions.
As with its initial transportation, its dimensions did not allow it to pass directly through the goods lift. The teams therefore dismantled it into several sections so that it could be removed from the site.
Once returned to Bonal Manutention's depot, the machine had to be reassembled and then placed back into its original crate in preparation for its return shipment in a container.
This dismantling and repacking operation is an essential step in ensuring that the equipment is properly handled until it reaches its next destination.
It demonstrates the teams' ability to manage the entire logistics cycle of an event-related operation, from initial reception to the return of equipment after the exhibition.
Through this operation, Bonal Manutention demonstrates its ability to support event organisers, manufacturers and industrial companies in their equipment handling and technical installation operations.
The agency mobilises its human expertise and technical resources to meet the needs of projects requiring specific organisation, control of access constraints and continuous adaptation to the particularities of each work site.
Whether receiving machines at the depot, preparing their transportation, carrying out lifting operations or ensuring their installation at an exhibition venue, the teams rely on their expertise to provide solutions tailored to the needs of each project.
This versatility enables Bonal Manutention to handle complex operations, including the dismantling, removal and repacking of equipment.
Groupe BOVIS' Industrial Centre of Excellence brings together specialised expertise in heavy and delicate handling, the transportation and installation of industrial machinery, as well as the management of complex technical operations.
It supports manufacturers, equipment suppliers and industrial companies with projects requiring specialised lifting equipment, adapted logistical organisation and thorough control of technical constraints.
Its areas of expertise notably include:
Thanks to the complementary expertise of its agencies and the pooling of their skills, Groupe BOVIS can provide solutions tailored to a wide range of operations, both in France and internationally.
Bonal Manutention's involvement in the CIGRE conference perfectly illustrates this expertise, with the handling of large industrial machines in a demanding event environment.
From receiving the equipment and installing it on the stands to dismantling and repacking it, this operation at the CIGRE conference demonstrates the technical expertise of the Bonal Manutention teams.
The mobilisation of 13 employees during the dismantling phase, the use of specialised lifting equipment and the management of access constraints highlight the importance of logistical preparation tailored to each project.
Thanks to its network of agencies and centres of excellence, Groupe BOVIS supports professionals with their handling, specialised transport and industrial machinery installation projects, providing technical solutions suited to even the most demanding equipment.